- VILLAGE SCHEDULE
- PRIMARY SCHEDULE
FOR CANVASSING VILLAGE SCHEDULE
-
- 1. IDENTIFICATION:
-
- Name of the
State Name of the District Name of the Block Date of Enumeration
- with code in
( ) with code in ( )
with code in ( )
-
- 2. SPECIFIC
INFORMATION
-
- Name of the
Geographical Cultivable Net Area
Average ground Major & Ground
- Village
with area (ha.) area (ha.) sown(ha.)
water level in medium water
- Code in ( )
metres schemes
schemes
-
-
-
-
-
-
Net area irrigated through
- -----------------------------------------------------------------------------------------------------------
- Major and
medium schemes Ground water
schemes Surface water scheme Total
-
- 8 9
10
11
- -----------------------------------------------------------------------------------------------------------
-
-
-
-
-
- Checked by: Signature
of Enumerator:
- Name and
Designation of Name and Designation of
- Supervisory
officer: Enumerator
-
-
- INSTRUCTIONS FOR FILLING UP THE PRIMARY VILLAGE SCHEDULE
- NOTE:
- The information is to be collected by the
primary enumerators through patwaris and their records or village level workers
with their records or similar agencies providing village level data to
government agencies.
- IDENTIFICATION: The standard codes of the state, district and block
are required to be noted in the respective columns.
- SPECIFIC INFORMATION:
- Column 1: The name of the
village is to be recorded in this column by the enumerators.
- Column 2: The geographical
area of the village as available in the revenue records is to be noted under
this column.
- Column 3: The cultivable area
of the village which includes the net area sown during 1993-94 and the current
fallow will constitute the cultivable area of the village.
- Column 4: The net area of the
village sown during the agriculture year 1993-94 is to be recorded under this
column. The year is commencing from
kharif 1993-July 1993 and ending with rabi 1994 (June 1994).
- Column 5: The average ground
water level in meters is to be recorded under this column. The enquiry in this regard may be made by
patwari/village level worker, etc. It
is actually the depth of the water level in the wells of the village from the
ground.
- Column. 6 to 9: In these columns, net area irrigated during 1993-94 by
major and medium schemes (irrigation scheme having CCA of more than 2000
hectares) by ground water schemes (dug wells, tube wells etc.) and other scheme
along with the total is to be recorded under these columns. Naturally, the ground water schemes and
other schemes would be the minor irrigation schemes only.
-
-
-
-