PRIMARY SCHEDULE FOR CANVASSING SCHEDULE A-3 DEEP TUBEWELLS (COMPLETED)

Reference year 1993-94

1.      IDENTIFICATION PARTICULARS:

Name of the State         Name of the district         Name of the block      Name of the village          Date              

 with code in(      )          with code in  (     )          with code in  (    )       with code in (     )             of

                                                                                                                                                  Enumeration

 

 

2.      SPECIFIC INFORMATION  

Sl.    Name of the   Khasra no./    Holding      Social         Year of                  Diameter (in  

no. owner/               plot/              size of         status          commissioning      m.m.) and

      name of the      survey/            the              of the                                     depth of the

          scheme       local no. in     owner            owner                                     tubewell

                              which the                            of the                                      (in m.m.)

                              tubewell is                          scheme

                               located

 (1)        (2a)                (2b)                 (3)               (4)                (5)                      (6)

 

 

 

_______________________________________________________________________

Status of well     Source of    Water distribution         Length of the distribution

                           finance        device used on the           channel  ( mts)

                                                scheme                     Pucca   Kuccha  Underground  Total

_______________________________________________________________________                                           

        (7)                  (8)                   (9)                      (10)        (11)            (12)           (13)

_______________________________________________________________________

 

 

 

_______________________________________________________________________

Lifting       Horse power   No. of average pumping     Whether tubewell is      Culturable command

device      of lifting             hour per day during           located in the                area  (ha.)

                 device                 peak season                   command of major/   

                                                                               medium schemes                  

                                                                               like canal etc.

    (14)       (15)                           (16)                                       (17)                            (18)

 

 

 


_______________________________________________________________________

Season-wise irrigation potential created                Season-wise area actually irrigated

during 1993-94 ( ha.)                                                during 1993-94 ( ha.)

--------------------------------------------------    -----------------------------------------------------

Kharif Rabi Perennial Others      Total          Kharif   Rabi   Perennial  Others   Total

   (19)   (20)    (21)       (22)        (23)            (24)      (25)        (26)     (27)       (28)

 

 

 

 

_______________________________________________________________________

Season-wise area also irrigated by major &                         constraints in way of full

medium schemes out of Col. 24 to 28                               utilisation of irrigation potential

Kharif   Rabi   Perennial    Others   Total

 

  (29)       (30)      (31)          (32)        (33)                                             (34)

 

 

 

_______________________________________________________________________

Checked by --------------------                                               Signature of Enumerator

Name & Designation of Supervisory Officer                        Name & Designation:


SCHEDULE A-3- DEEP TUBE WELL

 

Note: The well has to be enumerated only when it is meant for irrigation and is complete.  Deep tube wells are usually designed to give a discharge of 100 to 200 cubic meter per hour and extends to the depth of 70 meter or more only.  These include wells which are drilled by rotary percussion of rotary cum percussion rigs.  Deep tube wells are usually owned and operated by Government departments or corporations.  Its annual output is approximately 15 times that of an average shallow tube well depending on power availability.

Column 1: All deep tube-wells in the village are to be serially numbered to ensure ‘none is missed’. Serial number of deep tube-well in the village is to be noted under this column.

Column 2(a): deep tube wells are usually owned and operated by State government Departments or corporations.  The name of the owner is to be indicated in this column and the appropriate code number be noted as indicated below:-

Code no.:  Description

1.                  Government department/corporation

2.                  Cooperative owned

3.                  Panchayat owned

4.                  Group of farmers

5.                  Others.

Column 2 (b): Khasra no./plot no./survey no. in which the deep tube wells is installed be noted in the column for physical verifications etc. which may be needed at a later date.

Column3: Under this column size of ownership holding is to be considered.  Ownership holding will not include the land leased in or leased out from/to the other farmers for cultivation by the owner of the scheme.  Holding size is to be recorded only when the deep tube well happens to be owned by the individual or group of farmers then the appropriate code no. be noted as given below:

Code no.:  Holdings.

1.                  0-1 hectare (marginal farmers)

2.                  1-2 ha. (small farmers)

3.                  2-10 hectare (medium farmers)

4.                  More than 10 hectare (big farmers)

Column 4: Appropriate code would be indicated under it for schedule caste or scheduled tribe, others as the case may be as given below:-

Code no.:  Social status

1.                  Scheduled Caste

2.                  Scheduled Tribe

3.                  Others.

Column 5: Appropriate code for the year of commissioning of the scheme should be mentioned.  The scheme which were installed during 1986-87 or before are to be indicated with code no. ‘1’ only.  Codes are given below:-

Code no.: Year of commissioning

1.      On or before          1986-87

2.      During                   1987-88

3.      During                   1988-89

4.      During                   1989-90

5.      During                   1990-91

6.      During                   1991-92

7.      During                   1992-93

8.      During                   1993-94

Column 6: The diameter of the delivery pipe is to be noted in millimeters and the depth of the tube well in meters. 

 

Column 7: The purpose to know whether the tube-well is in use at present or not.  The appropriate code number be noted as given below:

 

Code no.:

1.   In use: If tube well is presently (i.e. during 1993-94) being used for irrigation

2        Not in use: Temporarily: If the tube well is not in use during last two years due to temporary reasons but has also not been abandoned for use.

3.      Permanently abandoned due to dried up

4.      Permanently destroyed beyond repair

5.      Permanently abandoned due to any other reason

Column:8 The deep tube well are usually owned by government or its allied department or a corporation under it.  Therefore in many cases the government itself is the source of financing the scheme.  However, in exceptional cases where deep tube-well are build up either by an individual farmer or group of farmers or cooperatives.  It may be indicated as any of the following alternatives and appropriate code no. be noted.

Code no.:

1.      Government funds

2.      Own saving of farmers

3.      Bank loan and saving

4.      Government  subsidy and bank loan

5.      Others.

Column 9: Farmers are adopting several different types of water conveyance channels and irrigation methods.  Recently sprinkler and drip irrigation methods have gained popularity among the farmers besides continuing conventional methods of ground water channel; underground water channel; etc. Appropriate code no.(s) is to be indicated for the water distribution device being used by the farmers and indicated below:-

Code no.: Device used

1.                  Sprinkler

2.                  Drip Irrigation

3.                  Open water channel

4.                  Underground Channel

5.                  Others.

Column 10 to 13: Length of the channel is to be recorded in meters under these columns.  In a scheme, there can be pucca channel, kutcha channel or underground channel or even a combination of these.

Column 14: The device used for lifting water from the tube-well is to be indicated by appropriate code no. as given below:-

Code no.:   Lifting device

1.                  Submersible pump

2.                  Turbine pump

3.                  Others.

Column 15: Record the Horse Power (HP) of the prime mover used for lifting water.

Column 16: It is to be noted that on an average, for how many hours per day, the water is being pumped out from the tube well during peak days of a season.


Column 17: Sometimes several minor irrigation schemes are located in the commands of major and medium schemes for conjunctive use.  Such schemes have to be enumerated.  The appropriate code no. be noted as given below:-

Code no.:

1.                  Yes

2.                   No

3.                   Yes for augmentation

 In case the deep tube well is for augmentation purpose, rest of the column would remain blank.

Col. 18: Under this column the area which is proposed to be irrigated by the deep tube well should be indicated in ha. It is generally the measurement of the field proposed to be irrigated by the deep tube well at the time of installation.In case the deep tube well is very old and the culturable command area is not available, the current maximum culturable command area of the deep tube well has to be noted.

Column 19 to 23: It is intended to find out the total potential created from the scheme.  It will indicate the area under kharif, rabi, perennial and other crops as proposed to be irrigated.  The total of column 19 to 22 is to be noted in column 23.  The figures under column 19, 20, 21 and 22 should be season-wise area proposed to be irrigated by the scheme.  If the tube well has been improved upon or augmented, then revised potential is to be indicated.  column 23 will indicate the gross irrigation potential created.  The figure in column 23 would certainly be higher or equal to the CCA reported in column 17.

Column 24 to 28: In these columns, the area actually irrigated during kharif, rabi, perennial crops and other crops is to be indicated.  The area irrigated under different seasons may be taken for the year 1993-94 i.e. commencing from kharif in 1993 and ending rabi 1994.  Column 28 will indicate the gross irrigation potential utilised.  Figure in column 28 would be less than or equal to the figures in column 23.

Column 29 to 33: Some of the minor irrigation deep tube well are located in the commands of major/medium irrigation projects.  And thus, they serve the purpose of supplementary irrigation or conjunctive use. In order to assess the extent of such supplementary irrigation, data is to be recorded under Col. 29 to Col. 33 regarding area which has also received irrigation from major/medium sources during the same crop season.  And that area is to be recorded season wise.

Column 34: The idea is to find out the reasons for the shortfall between the figures under the columns 23 and 28.  The appropriate code no. as mentioned below may be noted:

Code no.   Constraints

1.                  Non availability of adequate power

2.                  Mechanical breakdown

3.                  Less discharge in the well

4.                  Any other reason.